亚洲一级毛片免费在线观看,亚洲天堂在线视频播放,欧美成人激情在线,一本一本久久a久久精品,亚洲精品国产字幕久久vr,免费一区在线观看,精品十八禁免费观看,欧美视频久久久
        Your current location:Home -News -Industry news
        Industry news

        Key to hot runner system selection

        Date:2023-04-07View:9557

        A successful hot runner system mold application project requires several steps to ensure:


        1. Select the right hot runner supplier. As a plastic mold factory and plastic products injection factory, plastic products from which aspect? What about the mold structure? Mold and plastic products batch size, production efficiency, maintenance is to choose which supplier to consider.


        One is to choose manufacturers with rich experience and technical expertise in hot runner, because in the case of more mature mold manufacturing, the design and manufacturing capacity of hot runner determines the success of mold testing. The second is to choose companies with economies of scale, where all manufacturing processes are completed and the work of providing support services to users is more complete. Both need to be combined to better serve users.


        2. Correct selection of hot runner scheme. Plastics in the hot runner system to average the temperature, so that the flow to balance, hot runner companies use heat balance and mold flow analysis software is essential, at the same time to take into account the relevant mold manufacturing and injection molding experience, so that defects early to understand, early to overcome. For example, which heating method is adopted, whether the heat distribution is balanced, flow path, flow path size, heat insulation and cooling, whether there is interference in the oil and gas passage, whether the gate is reasonable and so on, can reduce the number of mold testing, more can reduce the cost of mold testing.


        3. Whether the hot runner material is the correct remedial measure. In plastic materials with different characteristics and different mold structures, the company's own materials are also important, because in addition to heat transfer balance, the design of the hot runner, but also good insulation, plus whether to ensure high speed, high pressure, high temperature and corrosion resistance factors to consider.


        4. Whether the hot runner treatment is accurate or not. The hot runner system is a combination, which requires high machining accuracy of various accessories and has optional interchangeability, so the machining accuracy must be standardized. Diverter plates require high parallelism, smooth passages, balanced passages without dead angles. There are special requirements for the concentricity and perpendicularity of the hot tip. The matching requirements of the needle and sleeve are also quite accurate and standardized.


        5. Whether the mold processing is accurate. The mold and the hot runner part of the installation and processing accuracy requirements of coordination, hot tip seal position, template parallelism, the surface of the cylinder hole, must ensure the machining tolerance range, and in the future to carry out multiple mold maintenance can also ensure deformation, while avoiding the protection of space heat and temperature line.


        6. Whether the hot runner can be properly maintained and maintained. In some fire protection materials of plastic injection molding, such as the down time more than half an hour, had better set the hot runner temperature below the melting temperature, if plastic injection molding and carbide with corrosion easily, you need to stop to repair the mold or mold, injection molding machine and hot runner injection molding to clean, had better use the normal plastic injection moulding machine washing cylinder and hot runner, after being completely remove the new material will be down from the plane of injection moulds. If it is not easy to change the color of the hot runner from the dark color, the light colored plastic of the machine can also be injected into the cylinder and hot runner before the mold, until the lighter material is injected, and then the mold is formed on the machine to remove the hot runner cleaner.

        主站蜘蛛池模板: 高清中文字幕一区二区| 绥棱县| 亚洲av色福利天堂| 玖玖365资源稳定资源站| 亚洲天堂一区二区久久| 临高县| 极品粉嫩小仙女高潮喷水视频 | 亚洲aⅴ无码成人网站国产| 在线午夜精品自拍小视频| 麻豆国产97在线 | 中国| 日韩熟女乱综合一区二区| 99国精品午夜福利视频不卡99| 玩弄极品少妇被弄到高潮| 熟女丝袜美腿亚洲一区二区三区| 国产精品青草久久久久福利99| 在线看免费无码的av天堂| 影音先锋大黄瓜视频| 久久久亚洲精品午夜福利| 91手机在线观看精品视频| 亚洲AV无码一区二区水蜜桃| 亚洲日韩电影久久| 精品亚洲成a人在线观看| 丁青县| 亚洲加勒比无码一区二区在线播放 | 国产av一区二区三区东北熟女| 桃子视频亚洲一二三区| 三级黄色片一区二区三区| 国产精品一区二区三区三级| 国产精品视频一品二区三| 国产高清不卡视频| 久久一区二区三区不卡| 日韩亚洲国产av自拍| 国语自产精品视频在线第100页| 麻豆av一区二区三区| 又硬又粗又长又爽免费看| 成人精品国产亚洲欧洲| 男人的天堂在线无码视频| 国产丝袜91| 久久精品国产一区二区三| 永久免费av无码网站直播| 和林格尔县|